Site Condition: How did misreported subterranean conditions result in millions of dollars of extra costs?
A general contractor with no rock excavation experience misrepresented the depth of rippable rock. This caused the very experienced grader to excavate more rock than its bid included, causing delay and a substantial cost overrun. How did the plaintiff demonstrate its case in arbitration?